INSTALLATION:
a) Electrical Installation

The Electrical Structure requires the following elements to carry over the generated power from Transformer to SEB Grid i.e.

  • RCC Poles
  • Insulators
  • Conductors
  • Earthling Elements
  • Connectors
  • Gang Operating System
  • Energy Meter
  • CT/PT
electrical installation
 
b) Transformer Installation

The transformer will be erected in the switch yard (Consumer DP) near by the Wind Mill and connected to the DP Structure and the panel by using the required HT PVC Cables. The Transformer will step up the generated voltage to grid voltage for evacuation of generated power.

transformer